Power Market Solver
Day-Ahead Market
Level 0: Single-hour clearing
Rules: Set the MW for each resource, then run the day-ahead market. Follow the objective described for the level.
Operating hours1
Load requirement70 MW
Reserve requirementNone
Transmission limitNone — single bus
Supply offers
Set each resource's MW with its slider. Curve levels use the offer curve to price every MW.
Market clearing stack
0 MW80 MW offered
Run the market to calculate awards and the DAM LMP.
Network Construction
Level 0: Basic path
Rules: Use every piece. Drag the pieces from the starting box into the workspace. Lines already have their values.
Select a component or line for details.
Power Market Solver
Level 0
Hover each for more details. Click the highlighted to solve!
Network
Solve
Level complete